As developments become increasingly reliant on electricity, understanding anticipated demand, available grid capacity and connection requirements early could become even more important.
FREE GUIDE TO DEVELOPERS
Download the Developer's Guide to the Future Homes Standard
Our free guide has been created to help developers understand what’s changing, what it could mean for their developments and the utility considerations they should be thinking about now.
WHAT'S INSIDE?
Download the Developer’s Guide to Future Home Standard
What the Future Homes Standard means for developers
The key changes coming in March 2027
How electrification could affect electricity demand
Why grid capacity needs to be considered early
The potential implications for infrastructure and site design
What developers can start doing now
A practical Future Homes Standard readiness checklist
Let's get started
Get your free copy
Complete the form to download the guide.
Contact Us
Don't leave the planning until later
The shift towards low-carbon heating, EV charging and renewable electricity generation means electricity requirements need to be considered carefully from the outset.
We save our customers time, hassle, and money by securing and managing fit for purpose solutions at the best possible rates.
WHAT IS NEEDED?
Understanding your requirements earlier can help you
Electricity demand
How much power could the development require?
Grid capacity
Is sufficient network capacity available?
Infrastructure
Could substations or other electrical infrastructure be required?
Site design
Has sufficient space been allowed for utility infrastructure?
Timescales
Have utility assessments, approvals and connections been factored into the project programme?
CSG Utilities supports developers from initial planning through to connection.
We can help with utility assessments, network connections, capacity considerations, infrastructure planning, project management and multi-utility coordination.